On 15 May I had the honour of presenting Wondervilla as a case study at a conference on BIM and its applications in contemporary architecture and construction.
The event, organised by One Team and Assimpredil-ANCE, took place at the ANCE offices in Milano, before an audience of 200 professionals and business owners.

During the presentation I explained how Wondervilla began and how I transformed my business from a general building firm into a company specialising in the design and construction of fully bespoke contemporary villas with an earthquake-resistant steel structure.
It all began with the need to protect Clients from the design and construction errors that inevitably drive up both build times and costs.
Thanks to BIM technology and rigorous procedures, the Wondervilla Method overcomes these problems and can build “turnkey” villas anywhere in Italy. We also have our sights set on projects abroad.
I discovered that of Italy’s 500,000 construction companies, only 50 use BIM, and Wondervilla is one of them.
This event, and the many people I met there, gave me great satisfaction and confirmed that the choices made over the last 3 years of work were the right ones.


In the villas we design, BIM supports the entire process, from the design to the build: it reduces errors and allows us to set out time and costs in the contract.
If you would like to know more about our working method, book a personal video call with no obligation and you can tell me about your specific needs.
If you would like to ask us something straight away, call us or message us on WhatsApp at +39 392 150 0378 and one of our Architects can already give you some initial answers.